Scoreboard and replay
Legible scores and graphics from the stands. Establish the sport, data source, video inputs and switching workflow.

Every moment, for the whole arena
Scoreboards, live video and advertising perimeters serve different purposes. Agree the display, data sources and operating modes with the venue team.
Legible scores and graphics from the stands. Establish the sport, data source, video inputs and switching workflow.
Placement beside the playing area requires a purpose-built variant, stability and venue requirement checks.
Announcements, training and competitions. Choose mounting, protection, brightness and access for everyday operation.
Application visualisationCheck height, angles and digit size from the farthest audience positions.
Protection, stability and safety zones must be confirmed for the exact model and installation.
Scoreboard software, timer and competition protocol integration are a separate part of the specification.
Cameras, brightness mode and redundancy are checked together before the event.
The proposal specifies equipment and work boundaries. Equipment, delivery, installation and content production are discussed as separate items.
Concept diagram. Exact models and connections are defined in the project.
Examples from the current catalogue. These are a starting point: exact variants, compatibility and the complete specification are confirmed for your site.

Outdoor LED cabinets for stadium perimeters and spectator areas.
Specifications and variants
Three factory outdoor LED cabinets P2.97–P4.81 in exact 500 × 500 or 500 × 1000 mm formats.
Specifications and variantsImpact protection and operating scenario must be checked for the exact variant. Series-level information does not establish suitability of every model.
Plans, photos, viewing distances, content and installation conditions. Outcome: agreed project inputs.
Geometry, equipment, control, power and work. Outcome: a proposal with explicit scope.
Scope verification, installation to the agreed design, setup and testing with actual content.
Wiring diagram, settings, instructions and maintenance procedure. Support terms are agreed in the contract.
Unilumin’s sports portfolio features a Manchester City installation using UsportX6.
View manufacturer’s publicationThe perimeter, main display and scoreboard should be treated as distinct subsystems with coordinated control.
Manufacturer’s project or sector overview. TOUCHLED does not claim participation in its delivery.TOUCHLED cases for this application are being prepared for publication. The reference above links to its original manufacturer source.
No. Near the playing area, construction, protective elements, stability and competition requirements need separate checks. Weather protection alone is insufficient.
Not automatically. A display controller receives an image; scoreboard software and sports-system data exchange must be specified separately.
The system can be designed for this. Agree sources, layouts, switching priorities and content rights in advance.
Start with the image, operating mode and complete equipment chain.
KNOWLEDGE BASE · 2 minCheck the complete proposal: surface, control, power, structure and work.
KNOWLEDGE BASE · 2 minFrom bill-of-materials checks to configuration handover: document a working result.
Tell us where the display will go and what it needs to show. If dimensions are not yet known, we can help define the project inputs.